Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We believe that prolonged time period partnership is really a result of top of the range, benefit added provider, prosperous knowledge and personal contact for Piling Pipe , Drainage Pipe Line , High-Quality S235 JR Spiral Steel Pipe , We are willing to give you the best suggestions on the designs of your orders in a professional way if you need. In the meantime, we keep on developing new technologies and creating new designs so as to make you ahead in the line of this business.
Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral Detail:

Product Description

Cangzhou Spiral Steel Pipes Group Co., Ltd have 4 production lines of anticorrosion & thermal insulation to perform the 3LPE coating and FBE coating. The maximum outside diameter can be 2600mm.

The coatings are suitable for the protection of buried or submerged steel pipes at design temperatures of -40℃ to +80℃.

The present standard specifies requirements for coatings that are applied to spirally welded steel pipes and fittings used for the construction of pipelines for conveying liquids or gases.

Applying this standard ensures that the PE coating provides sufficient protection against the mechanical thermal and chemical loads occurring during operation, transport, storage and installation.

Extruded coatings comprise three layers: an epoxy resin primer, a PE adhesive and an extruded polyethylene outer layer. The epoxy resin primer is applied as a powder. The adhesive can be applied either as a powder or by extrusion. For extruded coatings a differentiation is made between sleeve extrusion and sheet extrusion. Sintered polyethylene coatings are single or multi-layer systems. The polyethylene powder is fused onto the pre-heated component until the desired coating thickness is reached.

Epoxy resin primer

The epoxy resin primer is to be applied in powder form. The minimum layer thickness is 60μm.

PE adhesive

The PE adhesive can be applied in powder form or extruded. The minimum layer thickness is 140μm. the peel strength requirements vary depending on whether the adhesive was applied as a powder or was extruded.

Polyethylene coating

The polyethylene coating is applied either by sintering or by sleeve or sheet extrusion. The coating is to be cooled after application to avoid unwanted deformation during transport. Depending on the nominal size, there are different minimum values for the normal total coating thickness. In the case of increased mechanical loads the minimu layer thickess shall be increased by 0.7mm. minimum layer thickness are given in table 3 below.

product-description1


Product detail pictures:

Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures


Related Product Guide:

Adhering for the theory of quality, services, performance and growth, we have received trusts and praises from domestic and worldwide shopper for Chinese Professional Drainage Pipe Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral , The product will supply to all over the world, such as: Libya, Gambia, London, With the aim of compete with good quality and develop with creativity and the service principle of take customers' demand as orientation, we will earnestly provide qualified products and good service for domestic and international customers.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Natividad from El Salvador - 2018.02.12 14:52
    The company keeps to the operation concept scientific management, high quality and efficiency primacy, customer supreme, we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Tony from Zurich - 2018.06.03 10:17
    Write your message here and send it to us