High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It is a good way to enhance our products and solutions and repair. Our mission will be to build creative solutions to consumers with a great experience for Round Pipe Welding , Sewer Pipe Line , Steel Tube Piles , Safety through innovation is our promise to each other.
High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral Detail:

Product Description

Cangzhou Spiral Steel Pipes Group Co., Ltd have 4 production lines of anticorrosion & thermal insulation to perform the 3LPE coating and FBE coating. The maximum outside diameter can be 2600mm.

The coatings are suitable for the protection of buried or submerged steel pipes at design temperatures of -40℃ to +80℃.

The present standard specifies requirements for coatings that are applied to spirally welded steel pipes and fittings used for the construction of pipelines for conveying liquids or gases.

Applying this standard ensures that the PE coating provides sufficient protection against the mechanical thermal and chemical loads occurring during operation, transport, storage and installation.

Extruded coatings comprise three layers: an epoxy resin primer, a PE adhesive and an extruded polyethylene outer layer. The epoxy resin primer is applied as a powder. The adhesive can be applied either as a powder or by extrusion. For extruded coatings a differentiation is made between sleeve extrusion and sheet extrusion. Sintered polyethylene coatings are single or multi-layer systems. The polyethylene powder is fused onto the pre-heated component until the desired coating thickness is reached.

Epoxy resin primer

The epoxy resin primer is to be applied in powder form. The minimum layer thickness is 60μm.

PE adhesive

The PE adhesive can be applied in powder form or extruded. The minimum layer thickness is 140μm. the peel strength requirements vary depending on whether the adhesive was applied as a powder or was extruded.

Polyethylene coating

The polyethylene coating is applied either by sintering or by sleeve or sheet extrusion. The coating is to be cooled after application to avoid unwanted deformation during transport. Depending on the nominal size, there are different minimum values for the normal total coating thickness. In the case of increased mechanical loads the minimu layer thickess shall be increased by 0.7mm. minimum layer thickness are given in table 3 below.

product-description1


Product detail pictures:

High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures


Related Product Guide:

Our firm aims to operating faithfully, serving to all of our consumers , and working in new technology and new machine continually for High Definition Gas Metal Pipe - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral , The product will supply to all over the world, such as: Swaziland, Hungary, Naples, We will do our utmost to cooperate & satisfied with you relying on top-grade quality and competitive price and best after service ,sincerely look forward to cooperating with you and make achievements in the future!
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Andrew Forrest from Qatar - 2018.09.08 17:09
    In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Nana from Denver - 2017.08.18 18:38
    Write your message here and send it to us