High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Always customer-oriented, and it's our ultimate goal to get not only by far the most reputable, trustable and honest supplier, but also the partner for our customers for Hot And Cold Water Lines , Water Line Tubing , Helical Welded Pipe , Our company eagerly looks ahead to setting up long-term and pleasant small business partner associations with customers and businessmen from everywhere in the entire world.
High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral Detail:

Physical properties of epoxy powder materials

Specific gravity at 23℃: minimum 1.2 and maximum 1.8
Sieve analysis: maximum 2.0
Gel time at 200 ℃: less than 120s

Abrasive blast cleaning

Bare steel surfaces shall be abrasive blast-cleaned in accordance with SSPC-SP10/NACE No. 2 unless otherwise specified by the purchaser. The blast anchor pattern or profile depth shall be 1.5 mil to 4.0 mil(38 µm to 102 µm) measured in accordance with ASTM D4417.

Preheating

Pipe that has been cleaned shall be preheated at temperature less than 260℃, the heat source shall not contaminate the pipe surface.

Thickness

The coating powder shall be applied to the preheated pipe at a uniform cure-film thickness of not less than 12 mils(305μm) on the exterior or interior. The maximum thickness shall not exceed a nominal 16 mils(406μm) unless recommended by the manufacturer or specified by the pruchaser.

Optional epoxy performance testing

The purchaser may specify additional testing to establish epoxy performance. The following test procedures, all of which shall be performed on production pipe test rings, may be specified:
1. Cross-section porosity.
2. Interface porosity.
3. Thermal analysis (DSC).
4. Permanent strain (bendability).
5. Water soak.
6. Impact.
7. Cathodic disbondment test.


Product detail pictures:

High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures


Related Product Guide:

Control the standard by the details, show the power by quality. Our firm has strived to establish a extremely efficient and stable employees crew and explored an effective excellent command method for High Quality For Pipe Welding Procedures - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral , The product will supply to all over the world, such as: Mongolia, Croatia, Burundi, The company has perfect management system and after-sales service system. We devote ourselves to building a pioneer in the filter industry. Our factory is willing to cooperate with different customers domestic and overseas to gain better and better future.
  • The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Christine from Swedish - 2017.09.26 12:12
    This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Dee Lopez from Porto - 2018.07.12 12:19
    Write your message here and send it to us